7 days after closingmedian, all notices: 26 d (over 119,539 notices)
▸ how it's calculated▾ how it's calculatedhow it's calculated — Time to award
Time to award — where the number comes from
The calculation
Calendar days between closing (September 30, 2024) and the first award date published for this notice (October 7, 2024): 7 days.
What goes in
For this notice, every dated award counts, whatever its status, and the earliest date is kept. The median across all notices only keeps the notices whose earliest dated winning award, neither cancelled nor unsuccessful, falls on or after the closing day — over 119,539 notices.
Distribution
0 days100 days
middle half: 13 days to 46 days (bar) · median: 26 days (dark line) · this notice: 7 days (grey line)
14 days · computed between publication and closing
▸ how it's calculated▾ how it's calculatedhow it's calculated — Time to submit
Time to submit — where the number comes from
The calculation
Days between publication (September 16, 2024) and closing (September 30, 2024), rounded to the day: 14 days.
What goes in
The source publishes no duration for this notice: the number comes from its two dates. A gap of less than half a day, or a closing before publication, gives no window.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
72131701Pavage ou revêtement de routes ou d'autoroutes
SEAO, Données Québec · data as of October 4, 2026
Description
Text size100%
PROVINCE DE QUÉBEC AVIS PUBLIC APPEL D’OFFRES PROJET : Asphaltage rue Murray NUMÉRO D’APPEL D’OFFRES : AO- 53-2-96025-24-01 La Municipalité de Pointe-Lebel requiert des soumissions pour la réalisation des travaux d’asphaltage de la rue Murray sur une distance d’environ 290 mètres.
Read more — 1,879 charactersShow less
Les travaux incluent, sans toutefois s’y limiter, la décontamination, la scarification de la surface en gravier existante, le rechargement granulaire et la mise en place d’une couche unique d’enrobé bitumineux ainsi que le nettoyage et reprofilage des fossés. Le Soumissionnaire qui se verra octroyer le contrat devra réaliser les travaux selon les plans et devis réalisés par la FQM en date du 12 septembre 2024. Les travaux de pavage doivent être complétés au plus tard le 25 octobre 2024 et les autres travaux doivent être complétés avant le 1 er novembre 2024. La Municipalité ne s’engage à accepter ni la soumission la plus basse, ni aucune des soumissions reçues, et elle décline toute responsabilité à l’égard de l’un ou l’autre des Soumissionnaires en cas de rejet de toutes les soumissions. Le contrat est adjugé sur décision du Conseil de la municipalité, à sa seule discrétion, et la Municipalité ne peut être liée d’aucune autre façon que par une résolution de son Conseil. Date d’ouverture des soumissions : « 30 septembre 2024 à 11 h 00 » Lieu du dépôt des soumissions : 382, rue Granier, Pointe-Lebel (Québec) G0H 1N0 Sont admissibles à soumissionner au présent appel d’offres les Soumissionnaires ayant un établissement au Québec ou dans un territoire visé par un accord intergouvernemental de libéralisation des marchés applicable à la Municipalité dans le cadre du présent appel d’offres, soit l’Accord Québec-Ontario (ACCQO) et l’Accord de libre-échange canadien (ALEC). Les Soumissionnaires doivent se procurer les documents d’appel d’offres sur le site du SEAO. Les frais sont fixés selon la tarification établie par le SEAO. Une garantie de soumission de 10 % du prix soumis doit accompagner la soumission. Donné à la Municipalité de Pointe-Lebel, le TIME \@ "d MMMM yyyy" 16 septembre 2024 . Gilles Pineault , Directeur général Municipalité de Pointe-Lebel
reserved · subscriptionViews used up for this month: this block opens with an account.
Bidders
Bidders
Company
Amount submitted
EJD Construction Inc.amount retained
$219,733declared
JEAN FOURNIER INC.
$244,050declared
Bids range from $219,733 to $244,050 — a 11.1% spread between the lowest and the highest.The table is not sorted by amount: the source publishes no ranking, and we do not manufacture one.
2 bids received · 2 of 2 amounts declared · 2 bidders declared by the source
The source declares neither eligibility nor compliance for these bids.
SEAO, Données Québec · data as of October 4, 2026
The price to beat
90.0%code medianover 2,686 notices▸ how it's calculated▾ how it's calculatedhow it's calculated
Code median — where the number comes from — where the number comes from
The calculation
In Pavage ou revêtement de routes ou d'autoroutes (72131701), the lowest sits at 90.0% on median (quartiles 83.7 – 94.6%, over 2,686 public tenders).
What goes in
The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
▸ how it's calculated▾ how it's calculatedhow it's calculated — The price to beat
The price to beat — where the number comes from
The calculation
$219,733 (the lowest) ÷ $231,892 (the median of the 2 bids) = 94.8%
What goes in
The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed. The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
Breakdown
Lowest
$219,733
Median of offers
$231,892
Highest
$244,050
The lowest bid sits at 94.8% of the median of the amounts received.These are submitted amounts, not the signed contract.A public tender in this code receives 4 offers on median (quartiles 3 – 7, over 3,061 public tenders). 272 of them — 8.9% — received a single offer.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
Lauréo, “ASPHALTAGE DE LA RUE MURRAY”, MUNICIPALITE DU VILLAGE DE POINTE-LEBEL, notice no. 532960252401, data as of October 4, 2026, from SEAO / Données Québec (CC-BY 4.0). https://www.laureo.ca/en/avis/ocds-ec9k95-20019081
Reuse
Figures and text reusable with attribution. SEAO documents are never redistributed: they are linked to their official source.