Facts

Published
May 18, 2022
Time to award
45 days after closingmedian, all notices: 26 d (over 119,539 notices)
how it's calculated — Time to award

Time to award — where the number comes from

The calculation
Calendar days between closing (July 7, 2022) and the first award date published for this notice (August 21, 2022): 45 days.
What goes in
For this notice, every dated award counts, whatever its status, and the earliest date is kept. The median across all notices only keeps the notices whose earliest dated winning award, neither cancelled nor unsuccessful, falls on or after the closing day — over 119,539 notices.
Distribution
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
Contract nature
Goods
Place of performance
Chaudière-Appalaches
Documented stages
Contract
Time to submit
50 days · computed between publication and closing
how it's calculated — Time to submit

Time to submit — where the number comes from

The calculation
Days between publication (May 18, 2022) and closing (July 7, 2022), rounded to the day: 50 days.
What goes in
The source publishes no duration for this notice: the number comes from its two dates. A gap of less than half a day, or a closing before publication, gives no window.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
Value
— not declared
Reference
Notice no. 40825-2022
UNSPSC
39110000Luminaires et accessoires
SEAO category
G10 — Produits électriques et électroniques

SEAO, Données Québec · data as of October 4, 2026

Description

100%

AVIS PUBLIC

Appel d’offres MODERNISATION DU SYSTÈME D’ÉCLAIRAGE DU STADE DESJARDINS AVIS EST, PAR LES PRÉSENTES, DONNÉ QUE des soumissions cachetées et endossées relatives à la modernisation du système d’éclairage du stade Desjardins à Thetford Mines seront reçues au bureau de la soussignée jusqu’au 21 juin 2022 à 14 heures . Les documents seront disponibles dès le 25 mai 2022 exclusivement à partir du Système électronique d’appel d’offres (SÉAO) en téléphonant au (number on the official notice) ou en consultant le www.seao.ca ; les frais établis par cet organisme étant applicables. Un chèque visé ou un cautionnement de soumission irrévocable d’un montant correspondant à 10 % du total de la soumission est exigé pour le dépôt d’une offre. Les cautionnements irrévocables et les prix soumis devront être valides pour une période de cent vingt (120) jours de calendrier suivant la date d’ouverture de offres. Les soumissionnaires devront faire parvenir leur offre à l’attention de Me Mélanie Lebrun-Boivin , greffière, 144 rue Notre-Dame Ouest, Thetford Mines, Québec, G6G 1J3, et ce, avant 14 heures le 21 juin 2022 . Les luminaires soumis doivent être admissibles au programme Solutions efficaces d’Hydro-Québec. La Ville ne s’engage à accepter ni la plus basse ni aucune des soumissions reçues et elle se réserve le privilège de les accepter en tout ou en partie.

Read more — 119 charactersShow less

DONNÉ À THETFORD

MINES, ce 17 e jour de mai 2022. _______________________ Me Mélanie Lebrun-Boivin Greffière de la Ville

SEAO, Données Québec · data as of October 4, 2026

Precedents — this code at this buyer

Where do these figures come from?
reserved · subscriptionViews used up for this month: this block opens with an account.

Bidders

Bidders
CompanyAmount submittedEligibility
Installation Techno-Pro$414,225declaredCompliant
ROUTHIER ÉLECTRICIEN INC.$239,022declaredCompliant

Bids range from $239,022 to $414,225 — a 73.3% spread between the lowest and the highest.The table is not sorted by amount: the source publishes no ranking, and we do not manufacture one.

2 bids received · 2 of 2 amounts declared · 2 bidders declared by the source

SEAO, Données Québec · data as of October 4, 2026

The price to beat

93.7%code medianover 47 noticeshow it's calculated

Code median — where the number comes from — where the number comes from

The calculation
In Luminaires et accessoires (39110000), the lowest sits at 93.7% on median (quartiles 81.6 – 98.0%, over 47 public tenders).
What goes in
The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
87.2%gap to the marketover 108,521 noticeshow it's calculated

Gap to the market — where the number comes from — where the number comes from

The calculation
Elsewhere in the market, the lowest sits at 87.2% on median (quartiles 74.8 – 94.4%, over 108,521 public tenders).
What goes in
The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
how it's calculated — The price to beat

The price to beat — where the number comes from

The calculation
$239,022 (the lowest) ÷ $326,623 (the median of the 2 bids) = 73.2%
What goes in
The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed. The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
Breakdown
Lowest
$239,022
Median of offers
$326,623
Highest
$414,225
The lowest bid sits at 73.2% of the median of the amounts received.These are submitted amounts, not the signed contract.A public tender in this code receives 2 offers on median (quartiles 2 – 4, over 69 public tenders). 16 of them — 23.2% — received a single offer.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail

SEAO, Données Québec · data as of October 4, 2026

Contracting authority history — most recent awards

Where do these figures come from?
reserved · subscriptionViews used up for this month: this block opens with an account. Free with an account

Award

Winners and awarded amounts
YearWinnerValue
2022ROUTHIER ÉLECTRICIEN INC.$199,913declared

No signed contract published in the open dataset, more than a year after the closing date.

SEAO, Données Québec · data as of October 4, 2026

Documents

the source is silent — No document in the open dataset · SEAO notice

Similar open notices

how it's counted — Similar notices — how the list is built

Similar notices — how the list is built — where the number comes from

The calculation
Same UNSPSC classification (39110000), and still open.
What goes in
Other tender notices still open under the same code, whatever the organisation. This selection of still-open notices covers SEAO. Unverified CanadaBuys deadlines are excluded; federal notices remain available in search.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail

SEAO, Données Québec · data as of October 4, 2026

Cite this page
Permalink
https://www.laureo.ca/en/avis/ocds-ec9k95-1606534
Citation
Lauréo, “Modernisation du système d'éclairage du Stade Desjardins”, Ville de Thetford Mines, notice no. 40825-2022, data as of October 4, 2026, from SEAO / Données Québec (CC-BY 4.0). https://www.laureo.ca/en/avis/ocds-ec9k95-1606534
Reuse
Figures and text reusable with attribution. SEAO documents are never redistributed: they are linked to their official source.
Report an error