78100-511E_Réaffectation_Déconstruction_RÉVISÉ

Source: SEAO

Université de Montréal - DPMI · Public call for tenders · closed June 16, 2022 at 10:00 a.m., Quebec time

Facts

Published
May 16, 2022
Time to award
75 days after closingmedian, all notices: 26 d (over 119,539 notices)
how it's calculated — Time to award

Time to award — where the number comes from

The calculation
Calendar days between closing (June 16, 2022) and the first award date published for this notice (August 30, 2022): 75 days.
What goes in
For this notice, every dated award counts, whatever its status, and the earliest date is kept. The median across all notices only keeps the notices whose earliest dated winning award, neither cancelled nor unsuccessful, falls on or after the closing day — over 119,539 notices.
Distribution
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
Contract nature
Construction work
Documented stages
Tender update
Time to submit
31 days · computed between publication and closing
how it's calculated — Time to submit

Time to submit — where the number comes from

The calculation
Days between publication (May 16, 2022) and closing (June 16, 2022), rounded to the day: 31 days.
What goes in
The source publishes no duration for this notice: the number comes from its two dates. A gap of less than half a day, or a closing before publication, gives no window.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
Value
— not declared
Reference
Notice no. 78100-511E_AOP_Déconstr
UNSPSC
72000000Construction et maintenance de bâtiments ou d’installations
SEAO category
C01 — Bâtiments

SEAO, Données Québec · data as of October 4, 2026

Description

100%

L’Université de Montréal procède à un appel d’offres dans le but de retenir les services d’un entrepreneur général pour des travaux de déconstruction devant être effectués au Pavillon Roger-Gaudry Est situé sur son campus de la montagne . Projet : L’ouvrage faisant l’objet du présent Contrat s’inscrit dans le cadre du Projet Global de Réaffectations des espaces des Pavillons Roger-Gaudry et Marie-Victorin, situés sur le campus de la montagne de l’Université de Montréal.

Read more — 1,911 charactersShow less

Le présent contrat vise seulement les étages 7, 8 et 9 du secteur Est du Pavillon Roger-Gaudry. Il vise le projet 78100 – Déconstruction et travaux préparatoires, ce qui inclut la démolition d’aménagements existants. Les travaux de déconstruction seront majoritairement effectués en conditions d’amiante. L’enlèvement d’amiante se fera à un niveau de risque modéré à élevé, dans tous les secteurs touchés par la déconstruction. Ces travaux seront réalisés conformément aux devis et instructions de la firme experte en matières dangereuses (voir le devis concernant les matières dangereuses – documentation à télécharger – lien disponible sur le document DSUM-1). Le bâtiment sera occupé pendant toute la durée des travaux. Les travaux devront être coordonnés minutieusement de manière à assurer la sécurité des occupants, à minimiser l’impact sur les activités des occupants, à maintenir en opération les services électromécaniques dans les autres espaces occupés sur les mêmes étages et sur les autres étages. L’Ouvrage comprend les matériaux, les échafaudages, la main-d’œuvre, l’outillage, l’équipement, la machinerie, le transport, les ouvrages provisoires, les services temporaires et la surveillance nécessaires à l’exécution des travaux d’architecture, de mécanique et d’électricité, ce qui inclus en très grande partie de la démolition, mais également certains travaux de construction et de réinstallation, le tout conformément aux conditions applicables des dessins, spécifications et documents mentionnés dans le présent cahier des charges, y compris les ouvrages et services implicitement requis et nécessaires au parachèvement des travaux. Calendrier : L’Entrepreneur s’engage à prendre toutes les mesures nécessaires afin de respecter l’échéancier prévu pour débuter les travaux le ou vers le 8 août 2022 permettant l’émission du Certificat de réception définitive au plus tard le 2 décembre 2022 .

SEAO, Données Québec · data as of October 4, 2026

Precedents — this code at this buyer

Where do these figures come from?
reserved · subscriptionViews used up for this month: this block opens with an account.

Bidders

Bidders
CompanyAmount submittedEligibility
3469051 CANADA INC.$9,191,900declaredEligible and compliant
3469051 CANADA INC.$9,191,900declaredEligible and compliant
Les Entreprises Géniam$4,783,000declaredEligible and compliant
Les Entreprises Géniam$4,783,000declaredEligible and compliant
PROCONSTRUCTION$4,071,300declaredEligible and compliant
PROCONSTRUCTION$4,071,300declaredEligible and compliant
PROCONSTRUCTION$4,071,300declaredEligible and compliant
PROCONSTRUCTION$4,071,300declaredEligible and compliant
PROCONSTRUCTION$4,071,300declaredEligible and compliant
PROCONSTRUCTION$4,071,300declaredEligible and compliant

Bids range from $4,071,300 to $9,191,900 — a 125.8% spread between the lowest and the highest.The table is not sorted by amount: the source publishes no ranking, and we do not manufacture one.

34 bids received · 34 of 34 amounts declared · 3 bidders declared by the source

SEAO, Données Québec · data as of October 4, 2026

The price to beat

89.8%code medianover 7,216 noticeshow it's calculated

Code median — where the number comes from — where the number comes from

The calculation
In Construction et maintenance de bâtiments ou d’installations (72000000), the lowest sits at 89.8% on median (quartiles 81.5 – 95.3%, over 7,216 public tenders).
What goes in
The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
87.2%gap to the marketover 108,521 noticeshow it's calculated

Gap to the market — where the number comes from — where the number comes from

The calculation
Elsewhere in the market, the lowest sits at 87.2% on median (quartiles 74.8 – 94.4%, over 108,521 public tenders).
What goes in
The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
how it's calculated — The price to beat

The price to beat — where the number comes from

The calculation
$4,071,300 (the lowest) ÷ $4,071,300 (the median of the 34 bids) = 100.0%
What goes in
The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed. The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
Breakdown
Lowest
$4,071,300
Median of offers
$4,071,300
Highest
$9,191,900
The lowest bid sits at 100.0% of the median of the amounts received.These are submitted amounts, not the signed contract.A public tender in this code receives 4 offers on median (quartiles 2 – 6, over 8,847 public tenders). 1,247 of them — 14.1% — received a single offer.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail

SEAO, Données Québec · data as of October 4, 2026

Contracting authority history — most recent awards

Where do these figures come from?
reserved · subscriptionViews used up for this month: this block opens with an account. Free with an account

Award

Winners and awarded amounts
YearWinnerValue
2022PROCONSTRUCTION$4,071,300declared
2022PROCONSTRUCTION$4,071,300declared
Signed contracts and their end dates
ContractSignedEnd dateContract amount
577389The signed contract exceeds the awarded amount by $425,983 — +10.5%. A gap is a fact, not a judgement: across 121,996 comparable pairs it exists in 62% of cases, and half of them are below the awarded amount.29 amendments publishedFebruary 13, 2023ODC2 : Robinets d'isolement de cabinets incendieFebruary 13, 2023ODC4 : Retrait du reseau d'antenne Telus (7e, 8e, et 9e, étages)February 13, 2023ODC1 : Divers ajustements en architectureFebruary 13, 2023ODC3 : Retrait calorifuge drains pluviaux 8e étageFebruary 21, 2023ODC6 : Modification des gicleurs au 8e étage, ailes G, H et EFebruary 21, 2023ODC5 : Dégât d'eau au 8e étageMay 1, 2023ODC9 : CRÉDIT - Tuyauterie au 6e étage Protection pour demolition drains G729,G717,G715,D760,D727,D700 12 -72.11 -865.32 G829,G809,G817 2 -72.11 -144.22 G923,G907 2 -72.11 -144.22 Materiaux Toiles, tapes, filtres -400 Sous total (1,553.76) $May 1, 2023ODC10 : Ajustements aux compositions de plafond - Aile G Corridor G-70 - Conditions d'Amiante - Manutention et Évacuation des déchetsMay 1, 2023ODC7 : CRÉDIT - Réduction de la quantité de blocs vernissés (belden) à récuperer Difference des brique 9555 - 810 = 8745 unites 2$ x 8745 = $ 17,490.00May 16, 2023ODC15 : CRÉDIT - Retrait à la portée des travaux - Démolition des sections de câblage allant aux étages inférieurs (câbles du 7 e, 8e et 9e étages descendant aux 5e et 6e étages)May 16, 2023ODC13 : Ajustements aux compositions de plafondsMay 16, 2023ODC11 : Moyens de mitigation de moisissures au 9e étage aile G (gypse du mur exterieur sur l'axe Gm)May 16, 2023ODC12 : Contrôle de la propagation des poussières de silice provenant du chantier des Fenêtres et maçonnerie sur les façades E3 et D4-1 donnant vers la cour d’honneurMay 16, 2023ODC14 : NIV. 7 : Ajustements aux compositions de plafondsJune 28, 2023ODC19 : Ajout de gicleursJune 28, 2023ODC18 : Modification des montants des prix détaillés inclus 1.3 et 1.4July 10, 2023ODC21 : Électricité : Ajout chauffage dans le cabanon situé sur le toit de B6July 10, 2023ODC20 : Retrait des isolants calorifuges contenant de l’amiante recouvrant les éléments mécaniques à conserver aux 7e, 8e et 9e étagesJuly 27, 2023ODC22 : Hygiène industrielle : Sondage mécanique et encapsulation de l’ensemble des revêtements cimentaires au niveau des colonnes, poutres et plafonds aux 7e, 8e et 9e étagesSeptember 19, 2023ODC23 : Lors de la réunion de chantier du 31 août 2023, il a été convenu entre l’Entrepreneur et l’UdeM de l’échange suivant (troc sans coût ni crédit ni délais) pour les cinq (5) évènements spécifiquement citésOctober 1, 2023ODC8 : Modification des gicleurs au 7ème étage, aile D et au gicleur salle E-803October 3, 2023ODC24 : Démolition des équipements électromécanique dans la salle mécanique au 10ème étages aile G (local G-1113-1): - Retrait, déplacement contrôle - Démolir la tuyauterie - Démolir unité de ventilation et conduits - Démolitions en Électricité et plomberieOctober 13, 2023ODC26 : Architecture : Réparer un ferme-porte brisé par d’autresOctober 13, 2023ODC25 : Hygiène : Location et service d’entretien des machines HEPA dans le secteur G-9 contaminé aux moisissures pour la période du 04 mai au 29 mai 2023. L’ODC-25 vient compléter les ODC-11 et ODC-17October 19, 2023ODC17 : Réajustement du montant relatif à l’ODC-011 (DDC-UDM-14 pour la DDC-H-002) "Moyens de mitigation de moisissures au 9ème étage aile G (gypse du mur extérieur sur l’axe Gm)"October 19, 2023ODC16 : CRÉDIT - Montants des prix détaillés inclus non-utilisésDecember 19, 2023ODC27 : Nettoyage supplémentaire de la zone en risque élevée causé par le chantier des fenêtres et maçonnerieDecember 19, 2023ODC28 : Démolition des gicleurs de la salle mécaniqueMay 15, 2024ODC29 : Frais additionnels de gestion LEED relatif à la Prolongation du chantierThe source gives the reason and the date, never the amount. The how-much exists only in the gap above.2022July 2, 2024$4,497,283declared

SEAO, Données Québec · data as of October 4, 2026

Documents

the source is silent — No document in the open dataset · SEAO notice

Similar open notices

how it's counted — Similar notices — how the list is built

Similar notices — how the list is built — where the number comes from

The calculation
Same UNSPSC classification (72000000), and still open.
What goes in
Other tender notices still open under the same code, whatever the organisation. This selection of still-open notices covers SEAO. Unverified CanadaBuys deadlines are excluded; federal notices remain available in search.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail

SEAO, Données Québec · data as of October 4, 2026

Cite this page
Permalink
https://www.laureo.ca/en/avis/ocds-ec9k95-1605376
Citation
Lauréo, “78100-511E_Réaffectation_Déconstruction_RÉVISÉ”, Université de Montréal - DPMI, notice no. 78100-511E_AOP_Déconstr, data as of October 4, 2026, from SEAO / Données Québec (CC-BY 4.0). https://www.laureo.ca/en/avis/ocds-ec9k95-1605376
Reuse
Figures and text reusable with attribution. SEAO documents are never redistributed: they are linked to their official source.
Report an error
78100-511E_Réaffectation_Déconstruction_RÉVISÉ — Université de Montréal - DPMI — Lauréo