55788-Remplacement Verrières T-U-V-S_511-Pavillon Roger-Gaudry

Source: SEAO

Université de Montréal - Direction des immeubles · Public call for tenders · closed May 12, 2022 at 10:30 a.m., Quebec time

Facts

Published
April 7, 2022
Time to award
191 days after closingmedian, all notices: 26 d (over 119,539 notices)
how it's calculated — Time to award

Time to award — where the number comes from

The calculation
Calendar days between closing (May 12, 2022) and the first award date published for this notice (November 19, 2022): 191 days.
What goes in
For this notice, every dated award counts, whatever its status, and the earliest date is kept. The median across all notices only keeps the notices whose earliest dated winning award, neither cancelled nor unsuccessful, falls on or after the closing day — over 119,539 notices.
Distribution
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
Contract nature
Construction work
Documented stages
Tender update
Time to submit
35 days · computed between publication and closing
how it's calculated — Time to submit

Time to submit — where the number comes from

The calculation
Days between publication (April 7, 2022) and closing (May 12, 2022), rounded to the day: 35 days.
What goes in
The source publishes no duration for this notice: the number comes from its two dates. A gap of less than half a day, or a closing before publication, gives no window.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
Value
— not declared
Reference
Notice no. 55788-690_SG_PUB_C
UNSPSC
72000000Construction et maintenance de bâtiments ou d’installations
SEAO category
C01 — Bâtiments

SEAO, Données Québec · data as of October 4, 2026

Description

100%

Résumé du projet et des travaux à exécuter L’Université de Montréal procède à un appel d’offres dans le but de retenir les services d’un entrepreneur général pour la réalisation de travaux de remplacement des verrières et de la maçonnerie connexes devant être effectués au Pavillon Roger-Gaudry situé à son Campus de la montagne.

Read more — 3,025 charactersShow less

Résumé du projet et des travaux à exécuter Le projet consiste à remplacer les fenêtres situées ponctuellement au bout des ailes S-T-U et V du pavillon Roger-Gaudry, lequel est un bâtiment patrimonial, et d’effectuer les travaux de réfection de la maçonnerie contiguës aux fenêtres remplacées. Tous les travaux seront à effectuer sur tous les étages au secteur Ouest du pavillon Roger-Gaudry, du niveau 2 au niveau 7 inclusivement. Ces travaux seront exécutés en parallèle d’autres travaux sur le pavillon Roger-Gaudry, soit les projets pour la réaffectation des espaces du pavillon Roger-Gaudry. Les fenêtres devant être démolies sont elles-mêmes des fenêtres de remplacement qui ont dépassé leur cycle de vie et ne respectent pas la conception originale pour ces fenêtres. L’objectif de ce projet est de la mise en valeur des élévation originales avec des nouvelles fenêtres avec volets ouvrants qui respectent les éléments caractéristiques patrimoniales de ces fenêtres. La maçonnerie de brique pour une des ailes sera commandée directement du fournisseur par le propriétaire via un contrat direct d’approvisionnement. La maçonnerie de brique pour les autres ailes devra être identiques aux briques faisant l’objet de l’approvisionnement direct, et la fourniture fait partie du présent appel d’offres. Il est à noter que le bâtiment sera partiellement occupé pendant la durée des travaux. Important Une grille de conformité ( Annexe 1C-Grille de conformité) est à compléter par les entrepreneurs soumissionnaires, et constitue une condition d’admissibilité dans le cadre de l’évaluation de la conformité des soumissions et l’admissibilité des soumissionnaires, tout soumissionnaire qui ne répond pas aux critères énoncés dans la dite grille , sera déclaré inadmissible et verra sa soumission rejetée. Aussi, l’Université pourra à sa discrétion, sans obligation de sa part, vérifier l’information et requérir toute information supplémentaire. Dans l’éventualité où l’information fournie par le soumissionnaire à la présente grille de conformité s’avère fausse ou mensongère, le soumissionnaire sera déclaré inadmissible et sa soumission sera rejetée, celui-ci ne pouvant satisfaire aux conditions d’admissibilité Calendrier des travaux L’Entrepreneur s’engage à prendre toutes les mesures nécessaires afin de respecter l’échéancier prévu pour débuter les travaux le ou vers le 2022-06-01 permettant l’émission du Certificat d’acceptation définitive au plus tard le : 2024-03-15 ; Aile T Date de mobilisation : 1 er juin 2022 Date de fin des travaux : 15 décembre 2022 Aile S Date de mobilisation : 1 er avril 2023 Date de fin des travaux : 31 août 2023 Ailes U et V Date de mobilisation : 1 er avril 2023 Date de fin des travaux : 15 décembre 2023 Le projet sera réalisé selon 3 séquences de travaux distinctes. La première séquence consiste à réaliser les travaux sur l’aile T en 2022. La deuxième séquence consiste à réaliser les travaux sur l’aile S à l’été 2023 et les ailes U et V en 2023. . Pénalités pour retard : n/a

SEAO, Données Québec · data as of October 4, 2026

Precedents — this code at this buyer

Where do these figures come from?
reserved · subscriptionViews used up for this month: this block opens with an account.

Bidders

Bidders
CompanyAmount submitted
MAÇONNERIE RAINVILLE & FRÈRES INC.$5,179,150declared
MAÇONNERIE RAINVILLE & FRÈRES INC.$5,179,150declared
ST-DENIS THOMPSON INC.$5,155,070declared
ST-DENIS THOMPSON INC.$5,155,070declared
ST-DENIS THOMPSON INC.$5,155,070declared
ST-DENIS THOMPSON INC.$5,155,070declared
ST-DENIS THOMPSON INC.$5,155,070declared
ST-DENIS THOMPSON INC.$5,155,070declared
ST-DENIS THOMPSON INC.$5,155,070declared
ST-DENIS THOMPSON INC.$5,155,070declared

Bids range from $5,155,070 to $5,179,150 — a 0.5% spread between the lowest and the highest.The table is not sorted by amount: the source publishes no ranking, and we do not manufacture one.

18 bids received · 18 of 18 amounts declared · 2 bidders declared by the source

The source declares neither eligibility nor compliance for these bids.

SEAO, Données Québec · data as of October 4, 2026

The price to beat

89.8%code medianover 7,216 noticeshow it's calculated

Code median — where the number comes from — where the number comes from

The calculation
In Construction et maintenance de bâtiments ou d’installations (72000000), the lowest sits at 89.8% on median (quartiles 81.5 – 95.3%, over 7,216 public tenders).
What goes in
The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
87.2%gap to the marketover 108,521 noticeshow it's calculated

Gap to the market — where the number comes from — where the number comes from

The calculation
Elsewhere in the market, the lowest sits at 87.2% on median (quartiles 74.8 – 94.4%, over 108,521 public tenders).
What goes in
The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
how it's calculated — The price to beat

The price to beat — where the number comes from

The calculation
$5,155,070 (the lowest) ÷ $5,155,070 (the median of the 18 bids) = 100.0%
What goes in
The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed. The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
Breakdown
Lowest
$5,155,070
Median of offers
$5,155,070
Highest
$5,179,150
The lowest bid sits at 100.0% of the median of the amounts received.These are submitted amounts, not the signed contract.A public tender in this code receives 4 offers on median (quartiles 2 – 6, over 8,847 public tenders). 1,247 of them — 14.1% — received a single offer.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail

SEAO, Données Québec · data as of October 4, 2026

Contracting authority history — most recent awards

Where do these figures come from?
reserved · subscriptionViews used up for this month: this block opens with an account. Free with an account

Award

Winners and awarded amounts
YearWinnerValue
2022ST-DENIS THOMPSON INC.$5,155,070declared
2022ST-DENIS THOMPSON INC.$5,155,070declared
Signed contracts and their end dates
ContractSignedEnd dateContract amount
569885The signed contract exceeds the awarded amount by $1,988,798 — +38.6%. A gap is a fact, not a judgement: across 121,996 comparable pairs it exists in 62% of cases, and half of them are below the awarded amount.27 amendments publishedApril 6, 2023ODC-01 : DM-003-A: Condition d'hiver: Prix ventilé forfétaire pour les installations fixes au montant total de: 33 000,00$ (Toiture aile T 14 000,00$ + toiture aile V 14 000,00$ +Cabane isolée 5 000,00$) Les consomables seront facturés mensuellement sur présentation des factures détaillées.June 12, 2023ODC-02 : Directive de modification 004-A:Avis de changement de l'entrepreneur (AC002) augmentation du prix de la brique de 1,507$ à 1,730$ l'unité. Total pour ce projet: 5 478,60$July 31, 2023ODC03 : DM-002r2: Travaux de cloisonnement temporaire pour les locaux U-440 et U-440-1July 31, 2023ODC04 : DM-008 - AC011r1 : Peinture cloison temporaire au U-540 DM-009 - AC009 : Modifications local T-640 - item 1 cloison temporaireJuly 31, 2023ODC05 : DM-006: Demande de modification – Travaux de démolition – Moulure de plâtre - Aile TApril 29, 2024ODC 13: DM-007-M03-E03 : Modifications aux remontées de plafond et ajout d’un système de climatisation. AC023r01 - Travaux en architecture AC024 - travaux pour E03 AC025r1 - travaux pour M03 Les travaux de peintureApril 29, 2024ODC 14: DM-011 : Travaux de démolition – Moulure de plâtre - Aile V (AC028).April 29, 2024ODC 16:DM-047 : Coûts reliés aux travaux sous conditions d’hiver pour les ailes S, T, U et V – Hiver 2023-2024 L'AC046 inclut les frais forfaitaires ainsi que les frais mensuels pour la période du 2 novembre au 31 décembre 2023.April 29, 2024ODC 15: DM-0045 : Prolongation de l'échéancier - Aile V (AC037r1). Prolongation de l'échéancier cumulative entre l’échéancier original r00 daté du 19 juillet 2022 (2389_EchOriginalr00_220719.pdf)May 4, 2024ODC 22: Demande additionnelle de l'unitéMay 4, 2024ODC 18: Remplacement de la brique à l'aile S - Démolition parement de brique - AC033 33 040,08 $ DM-018r1 : Remplacement de la brique à l'aile S - Fourniture de nouvelles briquesMay 4, 2024ODC 21: Demande additionnelle de l'unitéMay 4, 2024ODC 17: DM-013 : Peinture cloison temporaire U6 - AC030 842,93$ DM-015-HS06 : Modifications aux retombées, démolition - AC031 17 656,66$May 24, 2024ODC 20: DM-023r1 :Mobilisation ailes V et S– Terre-plein - AC048 5 418,81 $ DM-028-S03 : Blocs linteaux – Aile U - AC035May 24, 2024ODC 19: Démolition sélective – Toits des pilastres, Ailes T, U et V et toits en cuivre des verrières, Aile S - AC032October 16, 2024ODC 29: Retrait de plâtre pour installation du mur rideau à l’aile T – Directive exécutoire (AC073r1)October 29, 2024ODC 27: Conditions d'hiver saison 2023-2024 (suite) (AC065r1)October 29, 2024ODC 30: Changements locaux T-239 et U-640 (AC086 et AC087)December 9, 2024ODC 26: Entreposage du mur rideau,Transition brique existanteDecember 12, 2024ODC 32: Rehaussement des poutres renverséesDecember 18, 2024ODC 31: Isolation des conduitsDecember 18, 2024ODC 33: Fermer l'ouverture de porte en bloc de bétonJanuary 10, 2025ODC: DM-039r1 - partie 2 : Modification des détails du mur rideau – Directive exécutoireFebruary 3, 2025ODC 35: DM-022r1 - Rejointoiement et autres réaprations ponctuelles (AC064r2 17 470,53$)DM-037 : Reconstruction du mur de maçonnerieMarch 12, 2025ODC 37: Remplacement de l'isolantJune 16, 2025ODC 42: Changement de maître d’oeuvre,Empêchement de travailler et tâches additionnellesJune 16, 2025ODC 43: Cadrage de porte en pierre,transition brique existante et Ajustements au comptoir du T-640The source gives the reason and the date, never the amount. The how-much exists only in the gap above.2022August 20, 2024$7,143,868declared

SEAO, Données Québec · data as of October 4, 2026

Documents

the source is silent — No document in the open dataset · SEAO notice

Similar open notices

how it's counted — Similar notices — how the list is built

Similar notices — how the list is built — where the number comes from

The calculation
Same UNSPSC classification (72000000), and still open.
What goes in
Other tender notices still open under the same code, whatever the organisation. This selection of still-open notices covers SEAO. Unverified CanadaBuys deadlines are excluded; federal notices remain available in search.
Source
SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail

SEAO, Données Québec · data as of October 4, 2026

Cite this page
Permalink
https://www.laureo.ca/en/avis/ocds-ec9k95-1591656
Citation
Lauréo, “55788-Remplacement Verrières T-U-V-S_511-Pavillon Roger-Gaudry”, Université de Montréal - Direction des immeubles, notice no. 55788-690_SG_PUB_C, data as of October 4, 2026, from SEAO / Données Québec (CC-BY 4.0). https://www.laureo.ca/en/avis/ocds-ec9k95-1591656
Reuse
Figures and text reusable with attribution. SEAO documents are never redistributed: they are linked to their official source.
Report an error
55788-Remplacement Verrières T-U-V-S_511-Pavillon Roger-Gaudry — Université de Montréal - Direction des immeubles — Lauréo