Construction d'un nouveau poste de la SQ à Vaudreuil - ISO Requis - Ent. Général
Source: SEAOSQI-Direction Gestion de projets Ouest du Québec · Public call for tenders · closed July 12, 2007 at 11:00 a.m., Quebec time
Facts
- Published
- June 12, 2007
- Time to award
- Not awarded yet
- Contract nature
- Construction work
- Place of performance
- Montérégie
- Documented stages
- Contract termination
- Time to submit
- 30 days · computed between publication and closing
how it's calculated — Time to submit
Time to submit — where the number comes from
- The calculation
- Days between publication (June 12, 2007) and closing (July 12, 2007), rounded to the day: 30 days.
- What goes in
- The source publishes no duration for this notice: the number comes from its two dates. A gap of less than half a day, or a closing before publication, gives no window.
- Source
- SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
- Value
- — not declared
- Reference
- Notice no. 133-07-800
SEAO, Données Québec · data as of October 4, 2026
Description
100%133-07-800 Objet et description du projet : (ou Spécialité) La Société sollicite des soumissions en vue de l’exécution de travaux pour la Vice Présidence Expertise Développement-Montréal à l’égard des immeubles décrits aux documents contractuels. Construction d’un nouveau poste de la Sûreté du Québec ISO 9001 : 2000 Requis – Entrepreneur Général MRC Vaudreuil-Soulanges Est Boul. Harwood Vaudreuil (Québec) Garantie de soumission 450 000,00 $ (Cautionnement) ou 225 000,00 $ (chèque visé, mandat, traite, lettre de garantie irrévocable, obligations payables au porteur).
Read more — 922 charactersShow less
VISITE DES LIEUX
Les soumissionnaires sont priés de prendre note qu'une visite des lieux sera effectuée par le chargé de projets. Les soumissionnaires intéressés devront se présenter à Vaudreuil-Soulanges, sur le bord du chemin en face du terrain situé du côté ouest du commerce de meubles Centre de liquidation Prillo, sis au boulevard 501 Harwood, et ce mardi le 19 juin 2007 à 10h00. Conditions Seules seront considérées les soumissions présentées par des soumissionnaires qui rencontrent les conditions suivantes :
- a) avoir un établissement au Québec ou, lorsqu'un accord intergouvernemental est applicable, au Québec ou dans une province ou un territoire visé par cet accord;
- b) avoir les qualifications exigées et détenir la licence requise en vertu de la Loi sur le bâtiment (L.R.Q., c.
B-1.1) et être certifié ISO 900 :2000. La Société se réserve le droit de n’accepter aucune des soumissions reçues, même la plus basse.
SEAO, Données Québec · data as of October 4, 2026
Precedents — this code at this buyer
Where do these figures come from?Bidders
| Company | Amount submitted |
|---|---|
| Construction SOCAM Ltéeamount retained | $4,788,300declared |
| Edilbec Construction inc. | $5,064,000declared |
| Entreprise de Construction TEQ inc. | $4,988,000declared |
| Innovtech Construction INC.. | $5,314,000declared |
| Les Constructions DeCastel inc | $5,136,000declared |
| Marieville Construction Inc. (MCI) | $5,484,000declared |
Bids range from $4,788,300 to $5,484,000 — a 14.5% spread between the lowest and the highest.The table is not sorted by amount: the source publishes no ranking, and we do not manufacture one.
6 bids received · 6 of 6 amounts declared · 6 bidders declared by the source
The source declares neither eligibility nor compliance for these bids.
SEAO, Données Québec · data as of October 4, 2026
The price to beat
87.2%gap to the marketover 108,521 noticeshow it's calculated
Gap to the market — where the number comes from — where the number comes from
- The calculation
- Elsewhere in the market, the lowest sits at 87.2% on median (quartiles 74.8 – 94.4%, over 108,521 public tenders).
- What goes in
- The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
- Source
- SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
how it's calculated — The price to beat
The price to beat — where the number comes from
- The calculation
- $4,788,300 (the lowest) ÷ $5,100,000 (the median of the 6 bids) = 93.9%
- What goes in
- The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed. The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
- Breakdown
- Lowest
- $4,788,300
- Median of offers
- $5,100,000
- Highest
- $5,484,000
- Source
- SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
SEAO, Données Québec · data as of October 4, 2026
Contracting authority history — most recent awards
Where do these figures come from?Award
| Year | Winner | Value |
|---|---|---|
| — | CONSTRUCTION SOCAM LTÉE | $4,788,300declared |
| Contract | Signed | End date | Contract amount |
|---|---|---|---|
| 242785The signed contract falls below the awarded amount by $578,861 — −12.1%. A gap is a fact, not a judgement: across 121,996 comparable pairs it exists in 62% of cases, and half of them are below the awarded amount. | — | February 25, 2021 | $4,209,439declared |
SEAO, Données Québec · data as of October 4, 2026
Documents
the source is silent — No document in the open dataset · SEAO notice
Similar open notices
the source is silent — Not computed: the source publishes no classification for this notice.