Firme d'architecture / Rénovation extérieure et intérieure / 3 maisons à Fermont
Source: SEAOCentre de services scolaire du Fer · By invitation · closing date not published
Facts
- Published
- December 13, 2018
- Time to award
- Closing date not published
- Method
- Contrat à la suite d'un appel d’offres sur invitation
- Contract nature
- Services
- Documented stages
- Contract update · Tender update
- Value
- — not declared
- Reference
- Notice no. CE 2018-2019 / 039
- UNSPSC
- 81200000Architecture
- SEAO category
- S3 — Services d'architecture et d'ingénierie
SEAO, Données Québec · data as of October 4, 2026
Description
the source is silent — Description not included in the open dataset — it remains on the notice at SEAO.
Precedents — this code at this buyer
Where do these figures come from?Bidders
| Company | Amount submitted |
|---|---|
| LG4 Architecture | $73,325declared |
| LG4 Architecture | $73,325declared |
| Onico Inc. | $42,956declared |
| Onico Inc. | $42,956declared |
| Onico Inc. | $42,956declared |
| Sublime Architecture inc. | $43,300declared |
| Sublime Architecture inc. | $43,300declared |
Bids range from $42,956 to $73,325 — a 70.7% spread between the lowest and the highest.The table is not sorted by amount: the source publishes no ranking, and we do not manufacture one.
7 bids received · 7 of 7 amounts declared · 3 bidders declared by the source
The source declares neither eligibility nor compliance for these bids.
SEAO, Données Québec · data as of October 4, 2026
The price to beat
82.8%code medianover 140 noticeshow it's calculated
Code median — where the number comes from — where the number comes from
- The calculation
- In Architecture (81200000), the lowest sits at 82.8% on median (quartiles 69.0 – 92.3%, over 140 public tenders).
- What goes in
- The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed.
- Source
- SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
87.2%gap to the marketover 108,521 noticeshow it's calculated
Gap to the market — where the number comes from — where the number comes from
- The calculation
- Elsewhere in the market, the lowest sits at 87.2% on median (quartiles 74.8 – 94.4%, over 108,521 public tenders).
- What goes in
- The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
- Source
- SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
how it's calculated — The price to beat
The price to beat — where the number comes from
- The calculation
- $42,956 (the lowest) ÷ $43,300 (the median of the 7 bids) = 99.2%
- What goes in
- The amounts bid on this notice that are above zero and published in the source's unit “1”: two different units do not compare. At least two distinct amounts are needed. The market reference applies the same rule to each notice, then takes the median of these percentages over 108,521 notices.
- Breakdown
- Lowest
- $42,956
- Median of offers
- $43,300
- Highest
- $73,325
- Source
- SEAO — Quebec open data · CC-BY 4.0 · data up to date as of October 4, 2026 · link to this detail
SEAO, Données Québec · data as of October 4, 2026
Contracting authority history — most recent awards
Where do these figures come from?Award
| Year | Winner | Value |
|---|---|---|
| 2018 | ONICO INC. | $42,956declared |
| 2018 | ONICO INC. | $42,956declared |
| Contract | Signed | End date | Contract amount |
|---|---|---|---|
| 374576The signed contract exceeds the awarded amount by $37,977 — +88.4%. A gap is a fact, not a judgement: across 121,996 comparable pairs it exists in 62% of cases, and half of them are below the awarded amount.2 amendments publishedJanuary 5, 2022Le projet de départ a été modifié et les travaux sont d'une plus grande ampleur que prévu. Nous avons demandé à refaire les plans au complet. Plus de déplacement et d'heure (dépenses à taux horaire) sont nécessaires.March 5, 2022Les travaux sont d'une plus grande ampleur que prévu. Plus d'heure et de déplacement nécessaire. Méthode à taux horaire.The source gives the reason and the date, never the amount. The how-much exists only in the gap above. | 2018 | July 8, 2024 | $80,932declared |
SEAO, Données Québec · data as of October 4, 2026
Documents
the source is silent — No document in the open dataset · SEAO notice
Similar open notices
the source is silent — No Québec notice still open under 81200000, nor in its family (8120).